Special works, poles, diaphragms
The executive challenge of creating a vertical excavation with a depth of 15m within the urban center and with the presence of underground water was solved by creating perimeter diaphragms (bulkheads) in waterproof reinforced concrete (white tank system) with a deep foundation function of the building and of the exposed perimeter wall for the three floors of the underground garage.
• Execution of foundation piles in reinforced concrete
• Geothermal
Drilling up to a depth of 185m and laying of geothermal probes.